EasyManua.ls Logo

Mitsubishi Electric MELSEC-Q Series - Page 163

Mitsubishi Electric MELSEC-Q Series
674 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
161
CHAPTER 5 PREPARATION AND SETUP
5
5.4 Testing the CC-Link IE Controller Network Module
5.4.2 Self-loopback test
*1 When the redundant system is in separate mode, power OFF and ON only system B or reset the CPU module of system
B.
*2 When the redundant system is in separate mode,
When executing the self-loopback test, be sure to connect a cable.
Also, do not insert or remove the cable during test execution. (Doing so will result in error completion.)
The self-loopback test result can be confirmed with the link special relay (SB0092, SB0093). ( Page 568, Appendix
1)
1) Set the mode of system B to online mode, and write the data to the system B CPU module.
2) Power OFF and ON only system B or reset the CPU module of system B.
3) Connect the programming tool to the control system CPU module, and change the mode of the redundant system
to backup mode.

Table of Contents

Other manuals for Mitsubishi Electric MELSEC-Q Series

Related product manuals