164
5.6 Tests for CC-Link IE Controller Network Startup
This section describes the tests to be executed at startup of the CC-Link IE Controller Network.
The tests check whether the network operates properly or not at system startup.
Perform each test according to the following.
When completed normally
When failed
End
Test result?
Start
Configuring network system
Connect CC-Link IE Controller Network modules
with optical fiber cables.
Power-on
Circuit test
Checks the network cable connection status, line
status, and each station's parameter setting status
from the control station.
Station-to-station test
Checks the status of the cable connected between
2 stations (from OUT of executing station to IN of
target station).
When checking the cable
between faulty stations
By the CC IE Control diagnostics, check the error
detail and take corrective actions.
Turn ON the external power supply. Check the
power supply module's POWER LED and the
CC-Link IE Controller Network module's RUN LED
are ON.
Network is operating normally.
Page 169, Section 5.6.2
Page 165, Section 5.6.1