168
● When executing the circuit test, connect each cable properly between OUT and IN.
Also, do not insert or remove a cable during test execution. (Doing so will result in error completion.)
● The circuit test result can be confirmed with the link special relay (SB0094, SB0095). ( Page 568, Appendix 1)
● For re-execution of the circuit test after circuit test completion, power OFF the control station and then ON, or reset the
CPU module.
(3) Checking the circuit test result in the CC IE Control diagnostics
When the circuit test has failed, identify the cause of the error in the CC IE Control diagnostics, and take
corrective actions according to the troubleshooting section. ( Page 541, Section 10.4)
Then, execute the circuit test again.
1. Select a faulty station.
2. Clicking an error details button (e.g. button) opens the "Error Details" window.
Take corrective actions according to the troubleshooting direction.