173
CHAPTER 5 PREPARATION AND SETUP
5
5.6 Tests for CC-Link IE Controller Network Startup
5.6.2 Station-to-station test
● When executing the station-to-station test, connect the cable properly between OUT and IN.
Also, do not insert or remove a cable during test execution. (Doing so will result in error completion.)
● The station-to-station test result can be checked with the link special relay (SB0097). ( Page 568, Appendix 1)