EasyManua.ls Logo

Mitsubishi Electric MELSEC-Q Series - Page 76

Mitsubishi Electric MELSEC-Q Series
674 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
74
(4) Operation in instruction execution
(a) Direct access on the sending side
• When near step 0
Refresh time between the CPU module and CC-Link IE Controller Network module using direct access is,
when compared to using link refresh, faster by up to one sequence scan time.
• When near END
Refresh time between the CPU module and CC-Link IE Controller Network module is almost the same
between link refresh and direct access.
(Link refresh)
(Direct access)
(Link refresh)
(Direct access)
0 END 0 END
Sequence scan
Link scan
B0
0 END 0 END
Sequence scan
Link scan
Same as completion status
of END processing
J1\B0
B0
0 END 0 END
Sequence scan
Link scan
J1\B0
0 END 0 END
Sequence scan
Link scan

Table of Contents

Other manuals for Mitsubishi Electric MELSEC-Q Series

Related product manuals