EasyManua.ls Logo

Mitsubishi Electric MELSEC-Q Series - Page 92

Mitsubishi Electric MELSEC-Q Series
674 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
90
5. The ON/OFF status of B0 of 1M
P
1 can be checked by LB1000.
Remark
Interlink transmission is also executable by using link direct devices in the sequence program.
The link refresh range is set as shown in (2) of this section.
When using it in a multiple CPU system
If different control CPUs are set for the network modules, interlink transmission is not executable with interlink transmission
parameters or a sequence program.
In such a case, use the CPU shared memory of the multiple CPU system.
For details of the CPU shared memory, refer to the following.
QCPU User's Manual (Multiple CPU System)
BMOV K4B0 J2\K4B1000 K2
1000 to 101F
0 to 1F
100 to 11F
200 to 21F
1300 to 131F
1020 to 103F
BMOV K4B100 J2\K4B1020 K2
BMOV K4B1300 J1\K4B200 K2
LB LB
2M
P11NS3
CPU module

Table of Contents

Other manuals for Mitsubishi Electric MELSEC-Q Series

Related product manuals