Platform floor Installation instruction
© 2013 Motala Hissar AB 4 (8) IQ56-15 Rev: (B)
4. INSTALLATION
4.1 Preparation
Prepare for the installation of the platform floor.
4.1.1 Fit the mechanical blocking
device
Fit the mechanical blocking device,
see related documentation IQ56-
03 Mechanical blocking device in
the pit MC2000 for installation
instruction.
4.1.2 Lifting tool
Place the lifting rod and the winch
in the top off the lift shaft.