EasyManua.ls Logo

Motala MC2000 User Manual

Default Icon
161 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
MOTALA HISSAR AB
Luxorgatan 1
Box 4029
591 04 Motala
SWEDEN
Tel: +46 (0)141-23 70 50
LOW SPEED LIFT
MC2000
2-6 landings
Automatic/manual doors
Assembly Instruction Manual
Release 2.02 2011-10-20
mc200501

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Motala MC2000 and is the answer not in the manual?

Motala MC2000 Specifications

General IconGeneral
BrandMotala
ModelMC2000
CategoryLifting Systems
LanguageEnglish

Summary

LOW SPEED LIFT MC2000

Introduction

Explains the purpose of the assembly manual for Motala Hissar MC2000 lifts.

Safety regulations

Highlights critical safety rules and warnings for lift installation and operation.

Wordlist

Tools

Preparations before assembly

Use the layout drawing for erection site check

Details checks for lifting heights, openings, space, power supply, and material.

Lift material

Instructions for checking lift components upon arrival and placement.

Lift well construction planning

Guidance on planning lift well construction, including glass module placement and cable channels.

Assembly

General information on how to erect modules

Provides general methods for assembling lift well and glass modules using screws or rivets.

Construction of precision gauge blocks

Explains the use of precision gauge blocks for correct height placement of glass modules.

Lift well assembly according to layout drawing.

Detailed steps for assembling the bottom part of the lift well, including corner profiles and modules.

Installation of electric cables and wires

Instructions for routing and connecting electrical cables for the lift system.

Guide rails

Steps for installing lower and upper guide rails, ensuring correct alignment and fastening.

Driving shafts, gear and motor

Instructions for installing the driving shaft, gear, and motor components.

Connecting pit functions

Details on connecting pit-related functions, including terminal floor switch and pit prop.

Connecting control panel wiring

Guidance on connecting control panel wiring and drive command box.

Door panel and removal of work platform

Steps for hanging doors, adjusting locks, and removing work platforms.

Commencing with drive command box

Instructions for starting the drive command box and performing initial checks.

Chain jointing rod

Procedure for jointing the drive chains using a jointing rod.

Platform

Instructions for assembling and installing the lift platform.

Fine adjustment of the platform

Steps for fine-tuning the platform's horizontal position and operation.

Fixing lift well

Instructions on how to secure the lift well structure.

Sills

Details on installing door sills at various landings.

Fixing plates

Guidance on securing fixing plates for cover plates and guide rails.

Travelling flex cable, panel plate, overload unit and control panel

Instructions for installing travelling cable, panel plate, overload unit, and control panel.

Cancelling drive command box

Procedure for cancelling the drive command box operation.

Ceiling

Instructions for installing the lift ceiling and its associated fittings.

Commencing from platform control panel

Steps to initiate operation using the platform control panel.

Lock arms

Instructions for fitting and adjusting lock arms on each floor.

Highspeed contact and magnet

Details on adjusting and installing high-speed contacts and magnets.

Lubrication

Guidance on lubricating guide rails and lock arm rollers.

Cover plates

Instructions for fitting small and large cover plates, including shaft hood.

Finishing work

Final steps including fitting motor cover, signs, cleaning, and patching paint.

Final inspection and own inspection

Procedure for conducting final inspection and filling out inspection forms.

Layout drawing

Checklist

Approvals and version history

Attachments

Hidden hinges

Mounting door leaf

Instructions for mounting the door leaf, including tips for hinge alignment.

Door stop

Guidance on installing a door stop to prevent over-opening.

Adjusting the hinges

Steps for adjusting hinges in height and ensuring proper fit to avoid play.

Mechanical blocking device in the pit MC2000

Overview

Describes the mechanical blocking device and its operating handle for pit safety.

Installation

Detailed steps for installing brackets, pulleys, handle, and the blocking device itself.

Adjustment of the wire

Instructions for adjusting the wire tension and checking the device functionality.

Remove slack in the operating handle and wire

Procedure for eliminating slack in the operating handle and wire for proper function.

Mount the retiring ramp and limit switch cams

Steps for mounting the retiring ramp and limit switch cams.

Mount the limit switches

Instructions for mounting the limit switches (62:N) and (62:U).

Adjustment of the limit switches positions

Guidance on setting limit switch positions for accurate floor stopping.

Updated version of the platform wall MC2000

Installation

Instructions for installing the overload arm, platform wall, and cables.

Fit the shelf

Steps for fitting the shelf and angle brackets.

Install the switch unit for the upper sensitive edge

Instructions for installing the switch unit for the upper sensitive edge.

Fit the switch for the over load device

Steps for fitting the switch unit for the overload device.

Fix the overload arm

Procedure for fixing the overload arm.

Fit the earth terminal and circuits board

Instructions for fitting the earth terminal, circuit board, and connecting cables.

Fit the upper sensitive edge

Steps for fitting the upper sensitive edge.

Place the side panels

Instructions for placing the left and right side panels.

Fix the side panels

Steps for fixing the side panels into the groove.

Fit the COP and handrail

Instructions for fitting the COP and handrail.

Install the COP panel step 1

Step 1 for installing the COP panel, loosening screws and inserting hinge plates.

Install the COP panel step 2

Step 2 for installing the COP panel, tightening screws.

Install the COP panel step 3

Step 3 for installing the COP panel, applying wire to the wall.

Install the COP panel step 4

Step 4 for installing the COP panel, applying wire to COP and connecting cables.

Install the COP panel step 5

Step 5 for installing the COP panel, sliding COP until it stops.

Install the COP panel step 6

Step 6 for installing the COP panel, fixing the COP.

MC2000 - Flip chair on the platform

Installation

Steps for installing the consol and mounting the flip chair.

Test the flip chair

Procedure for testing the flip chair's functionality and magnetic hold.

Refit the COP and make a function test of the COP

Instructions for refitting the COP and performing a function test.

MC2000 - Exclusive option for the platform

Installation

Instructions for fitting side panels, COP, and exclusive wall components.

Fit the exclusive wall step 1

Step 1 for fitting the exclusive wall, removing protective paper.

Fit the exclusive wall step 2

Step 2 for fitting the exclusive wall, placing and taping the lower part.

MC2000 – Automatic door operator – Headroom 1300 mm (half door)

Installation

Instructions for connecting cables and fitting the automatic door operator.

Prepare to fit the automatic door operator

Steps to prepare for fitting the automatic door operator, including arm positioning.

Fit the automatic door operator

Procedure for fitting the automatic door operator using screws.

Adjust the slow speed

Guidance on adjusting slow speed using a separate document and fitting the cover.

Threshold Installation instruction

SITE REQUIREMENTS AND TOOLS

Details site requirements, tools needed, delivery check, and standard sizes.

Preparation

Preparation steps for fitting the threshold, including finished floor checks.

Fitting the threshold

Steps for marking, fitting the outer and inner parts of the threshold.

MC2000 – Manual door closer – Headroom 1300 mm (half door)

Installation

Instructions for fitting the slider and the door closer.

Adjustment

Guidance on adjusting the door closer and final checks.

Adjustment method for platform and gliding shoes

Adjustment

Procedure for adjusting platform gliding shoes to avoid vibrations.

Loosen the screws

Step to slightly loosen screws on gliding shoes.

Load the platform

Instruction to load the platform with 150kg.

Tighten screws

Steps to tighten screws with specified torque.

Test for vibrations

Procedure to test drive the platform with and without load for vibrations.

Platform floor Installation instruction

PREPARATION

Preparation steps for platform floor installation, including mechanical blocking device.

Fit the mechanical blocking device

Instructions to fit the mechanical blocking device as per related documentation.

LIFTING TOOL

Instructions for placing the lifting rod and winch in the lift shaft.

Lift the platform into the well

Procedure for lifting the platform into the lift well using two persons.

Connect the winch to the platform lifting eye

Steps to connect the winch hook to the platform lifting eye.

Prepare to lower the platform

Instructions to prepare for lowering the platform using the winch.

Lowering the platform to horizontal position

Procedure for lowering the platform to a horizontal position.

Fix the platform

Steps for fixing the platform in position using screws.

Finalize the fixing of the platform

Final steps to secure the platform by fitting remaining screws.

Remove the lifting eye

Instructions for removing the lifting eye and storing it.

Emergency lowering Installation instruction

PREPARATION

Preparation steps for emergency lowering installation, including motor and bracket unit.

Fit the bracket unit

Instructions for fitting the bracket unit under the motor.

Adjust bracket unit

Steps to adjust and tighten the bracket unit to avoid vibration noise.

Center entrance hole for lowering tool

Procedure for centering the entrance hole for the lowering tool.

Loosen screws

Step to slightly loosen screws.

Fit the lowering tool

Instructions for fitting the lowering tool into the hole.

Insert the allen key in the motor shaft

Verify that the allen key is inserted in the motor shaft.

Fix the adjusted hatch

Step to tighten screws to fix the adjusted hatch.

Verify function

Procedure to verify the emergency lowering function and safety circuit.

Wall installation - How to fit glass panel-screws into sandwich panel

PREPARATION

Preparation steps for fitting glass panel screws into sandwich panels.

Check witch screws are not going in to the sandwich panel

Check that screws do not penetrate the sandwich panel's sheet metal flange.

Modify sandwich panel

Modify the sandwich panel flange to allow screw heads to pass.

Check fitting

Check fitting of glass and sandwich panels before installation.

Check fitting of the glass panel and the sandwich panel

Verify that the sandwich panel male fits into the glass panel female.

MC2000 – Clamp protection – Automatic door operator – ST1300 mm (half door)

PREPERATION

Preparation for installing clamp protection, lowering engine cabinet if needed.

Lower engine cabinet

Instructions for lowering the engine cabinet if it obstructs clamp protection fitting.

Markings for holes

Procedure for marking hole positions for clamp protection.

Fit the clamp protection

Steps to fit the clamp protection using M5 holes and screws.

Hidden hinge cable protection Installation instruction

Install hidden hinge cable protection

Instructions for installing rubber blocks for hidden hinge cable protection.

Fit rubber block

Procedure for fitting the rubber block onto the hinge.

Rubber block placement

Ensuring the rubber block is firmly squeezed into place above the hinge.

Fit the plastic cover

Instructions for fitting the plastic cover before closing the landing door.