EasyManua.ls Logo

Motala MC2000 - Lift the platform into the well; Connect the winch to the platform lifting eye

Default Icon
161 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Platform floor Installation instruction
© 2013 Motala Hissar AB 5 (8) IQ56-15 Rev: (B)
4.1.3 Lift the platform into the well
Two persons is needed to lift the
platform into the lift well. Use 2x
lifting tool 731953.
4.1.4 Connect the winch to the
platform lifting eye
Connect the winch hook to the
lifting eye on the platform. Check
that the screws for the lifting eye is
firmly tighten.

Table of Contents