EasyManua.ls Logo

Motala MC2000 - Prepare to lower the platform; Lowering the platform to horizontal position

Default Icon
161 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Platform floor Installation instruction
© 2013 Motala Hissar AB 6 (8) IQ56-15 Rev: (B)
4.2 Fit the platform
4.2.1 Prepare to lower the platform
Use the winch to put the platform in
the right position. Be careful not to
damage or make scratches in the
lift well. Fix the platform in the outer
upper hole with a loose screw, use
1x 100179 on each side.
4.2.2 Lowering the platform to
horizontal position
Use the winch to lower the platform
to horizontal position.

Table of Contents