EasyManua.ls Logo

Motala MC2000 - 1 General; Related Documents; 2 Safety; 3 Site Requirements and Tools

Default Icon
161 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Platform floor Installation instruction
© 2013 Motala Hissar AB 3 (7) IQ56-16 Rev: -
1. GENERAL
This emergency lowering is special designed to be fitted on MC2000. Follow this instruction
carefully to ensure an efficient and trouble-free installation.
1.1 RELATED DOCUMENTS
This instruction is to be used with the MC2000 installation instruction.
2. SAFETY
Personal safety precautions for fitters.
Always use Personal Protective Equipment (PPE). Always use Head protection, Eye
protection, Foot protection, Hand protection, Protective clothing, Face shield and
Safety harness.
Follow the safety precautions in the MC2000 installation instruction.
3. SITE REQUIREMENTS AND TOOLS
3.1 TOOLS
Hand tools.
3.2 CHECK DELIVERY
Check that the deliver is complete and not damaged.

Table of Contents