MOTALA HISSAR AB
Luxorgatan 1
Box 4029
59104 Motala
SWEDEN
Tel: +46 (0)141-23 70 50
Safety regulations 3
Wordlist 4
To
ols 5
Preparations before assembly 6
Use the layout drawing for erection site check 6
Lift material 6
Lift well construction planning 6
Assembly 7
Introduction 7
General information on how to erect modules 7
Construction of precision gauge blocks 7
Lift well assembly according to layout drawing. 9
Installation of electric cables and wires 23
Guide rails 24
Driving shafts, gear and motor 27
Connecting pit functions 29
Connecting control panel wiring 30
Connecting drive command box 30
Door panel and removal of work platform 31
Commencing with drive command box 32
Chain jointing rod 32
Platform 33
Fixing lift well 35
Sills 35
Fixing plates 36
Travelling flex cable, panel plate, overload unit and control panel 37
Cancelling drive command box 41
Ceiling 41
Commencing from platform control panel 42
43
Lock arms 43
Highspeed contact and magnet 43
Lubrication 44
Cover plates 45
Finishing work 47
Final inspection and own inspection 47
Layout drawing 48
Checklist 49
Approvals and version history 50
Attachments