EasyManua.ls Logo

Motala MC2000 - Page 16

Default Icon
161 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MC2000 – Assembly Instruction Manual
14
Placing the lift well in the pit
Erecting the work platform, landing 0.
1. Adjust the placing of the lift well in the pit
and chec
k that the lift well can pass freely
upwards through the joists.
2. Measure and adjust the diagonal measure-
ments of the lift well.
mc200519A
1. Erect the work platform in the two pre-
drilled holes of the door frame. Unfold the
platform and set up two adjustable legs in
the back edge of the platform.
mc20051

Table of Contents