EasyManua.ls Logo

Omron C200H-MC221 - Page 255

Omron C200H-MC221
305 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Appendix AControl Bit/Flag Timing Charts
235
32. Cycle Start Bit and Optional Input
Operation
Cycle Start Bit
Optional Input
Program execution starts when the Cycle Start Bit is turned ON. The next block after the OPTIONAL SKIP function
(G75) is skipped because the optional input is ON.
33. Cycle Start Bit and Optional Input
Operation
Cycle Start Bit
Optional Input
Program execution starts when the Cycle Start Bit is turned ON. The status of the optional input is checked when
the OPTIONAL PROGRAM STOP function (G76) is executed, and the program is stopped because the optional
input is ON.
34. Cycle Start Bit and Optional Input
Operation
Cycle Start Bit
Optional Input
Program execution is restarted when the Cycle Start Bit is turned ON. The status of the optional input is read due to
the execution of the OPTIONAL END function (G74) and G04 is cancelled.
35. Forced Block End Bit and Optional Input
Operation
Forced Block End Bit
Optional Input

Table of Contents

Other manuals for Omron C200H-MC221

Related product manuals