EasyManua.ls Logo

Omron FQ-CR2 - Page 114

Omron FQ-CR2
193 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Controlling/Outputting in Parallel
112
FQ-CR2 User’s Manual
Timing chart
When inspection is NG
1 IN0, 1 and 4 are turned OFF, IN2 and
3 are turned ON.
2 When IN5 is turned OFF > ON with
the BUSY signal OFF, trigger retry
inspection starts.
3 When retry inspection starts, the
BUSY signal turns ON.
4 If retry inspection ends but the overall
judgment is NG, the OR signal turns
ON. (Output polarity: When ON at
NG)
OFF
ON
OFF
ON
OFF
ON
IN5 signal
IN0 to 4 signals
IN5 ON after at least 5 ms
Retry starts
Scan
NG
Scan
NG
Scan
NG
Scan
NG
Retry ends
BUSY signal
OR signal
FQ Sensor User Manual.book 112 01年78日 金曜 午2時0分

Table of Contents

Related product manuals