EasyManua.ls Logo

Ridder VitaLite-E - Page 4

Ridder VitaLite-E
110 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4.8.1 Display board of the control panel
38
4.8.2 Connecting Synopta
40
5 Commissioning
41
5.1 Control panel
41
5.1.1 Reading out and setting variables
43
5.1.2 Alarms
43
5.2 Commissioning
44
5.2.1 Log in at dealer level
44
5.2.2 Check settings
44
5.2.3 Set start conditions
44
5.3 Testing the unit
44
5.3.1 Manually start disinfection
44
5.3.2 Manually start cleaning quartz tubes
46
5.3.3 Manually start filter flushing
47
5.4 Quality control
48
5.4.1 Sampling procedure for CFU testing
48
6 Operation
50
6.1 Power switch
50
6.2 System pump and dosing pump
50
6.3 Disinfection
51
6.3.1 Warming up UV lamps
52
6.3.2 Disinfection active
53
6.3.3 Stopping disinfection and post-flushing
53
6.4 Filter flushing
54
6.5 Cleaning quartz tubes
55
6.5.1 Dosing and circulating acid
55
6.5.2 Post-flushing after cleaning quartz tubes
56
7 Maintenance and quality control
57
7.1 Maintenance
57
7.2 Weekly maintenance
57
7.3 Monthly maintenance
57
7.4 Yearly maintenance
58
Appendix A:Control overview
59
8.1 General settings
59
8.1.1 System settings
60
8.2 System configuration
61
8.2.1 System activation
61
8.2.2 Identification
62
8.2.3 Protected settings
62
8.3 Communication
65
8.3.1 Console settings
65
8.3.2 IO bus settings
65
8.3.3 Synopta settings
65
8.3.4 Network settings
66
8.3.5 Modbus Settings
66
8.3.6 EC calibration
66
8.3.7 pH calibration
66
8.4 I/O
66
8.4.1 Modules
66
8.4.2 Control outputs
67
8.5 Backup settings
67

Table of Contents

Related product manuals