<M> Settings / General
Response to restart
l Pause: When power returns after a power failure, the group that
was active before the power failure will be paused. Also, the
alarm message 'Paused after restart’ will be generated.
l Continue: When power returns after a power failure, the
interrupted processes will continue. If a second restart occurs
within 30 minutes, then the group will be paused and the alarm
message 'Paused after restart’ will be generated.
System settings
System configuration
Communication
EC calibration
pH calibration
I/O
Backup settings
8.1.1 System settings
<M> Settings / General / System settings
Language selection
This allows you to select the language shown
on the control cabinet display. The available
languages may differ depending on the
software version you are using.
Longitude
Here you enter the longitude of the
greenhouse location. This is used to calculate
the sunrise/sunset time.
Enter the longitude in
degrees and separate
minutes by a period:
dd.mm. (Do not enter as a
fraction.)
Latitude
Here you enter the latitude of the greenhouse
location. This is used to calculate the
sunrise/sunset time.
Enter the latitude in degrees
and separate minutes by a
period: dd.mm. (Do not
enter as a fraction.)
Time zone
Here you enter the time zone in relation to
Greenwich Mean Time. This is used to
calculate the sunrise/sunset time.
Time correction
This sets the number of msec/day with which
the clock is to be corrected.
VitaLite
60