Activate the VitaLite-E and C manually and check the VitaLite-E and C for the following
points:
Are all the valves working correctly during the warm-up phase, disinfection and
post-flushing?
Is the pump running? Is the flow rate sufficient?
Have the lamps switched on? Is the measured radiation level sufficient?
Check the pH value and, if present, the EC value.
Check whether the ballast ventilation is working.
Figure 5-2: Warm-up phase
Figure 5-3: Disinfection