EasyManuals Logo

Shimadzu LC-40D XR CL User Manual

Shimadzu LC-40D XR CL
144 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #29 background imageLoading...
Page #29 background image
3
Press [2], [ . ], [0] and [Enter].
The minimum pressure is set to 2.0 MPa.
If [P.MIN] is set to "0", solvent delivery will not stop and an alarm will not
sound even if the pressure has dropped. The minimum pressure can be set to
130 MPa max. for LC-40D X3 CL and 60 MPa max. for LC-40D XR CL.
"Setting the minimum pressure during deliveryP.MIN" P.31
3.2 Operation
3.2.1
Preparation before Operation
1
Pour the mobile phase into the reservoir bottle.
2
Place a suction filter into the reservoir bottle.
3
Connect the tubing provided to the pump outlet.
4
Put the end of the drain tubing into the waste container.
5
Turn the drain valve knob
90°counterclockwise to open the drain
valve.
LC-40D X3 CL LC-40D XR CL
19
3.2 Operation
3

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Shimadzu LC-40D XR CL and is the answer not in the manual?

Shimadzu LC-40D XR CL Specifications

General IconGeneral
BrandShimadzu
ModelLC-40D XR CL
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals