EasyManua.ls Logo

Shimadzu LC-40D XR CL - Operation; Preparation before Operation

Shimadzu LC-40D XR CL
144 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
Press [2], [ . ], [0] and [Enter].
The minimum pressure is set to 2.0 MPa.
If [P.MIN] is set to "0", solvent delivery will not stop and an alarm will not
sound even if the pressure has dropped. The minimum pressure can be set to
130 MPa max. for LC-40D X3 CL and 60 MPa max. for LC-40D XR CL.
"Setting the minimum pressure during deliveryP.MIN" P.31
3.2 Operation
3.2.1
Preparation before Operation
1
Pour the mobile phase into the reservoir bottle.
2
Place a suction filter into the reservoir bottle.
3
Connect the tubing provided to the pump outlet.
4
Put the end of the drain tubing into the waste container.
5
Turn the drain valve knob
90°counterclockwise to open the drain
valve.
LC-40D X3 CL LC-40D XR CL
19
3.2 Operation
3

Table of Contents

Related product manuals