7
03.96
7.2 Overview of organization blocks, function blocks and DBs
7-184
Siemens AG 2000 All Rights Reserved
SINUMERIK 840D Installation and Start-Up Guide (IAD) – 04.00 Edition
FB 1 (power-up block of basic PLC program) must be supplied with variables.
For an exact description of the variables and the ways in which parameter
settings can be altered, please refer to
References: /FB/, P3, “Basic PLC Program”
Note
Timers T0 to T9 are used by the basic program.
7.2 Overview of organization blocks, function blocks and
DBs
References: /FB/, P3, “Basic PLC Program”
J
Parameters of FB1
7 PLC Start-Up