5. Wrap the chain around the pipe; first onto the centering pin on the bottom track and then
onto the hook on the top track.
① Chain Tension Screw ⑤ Centering Pin
② Chain Hook ⑥ Sensor 1 and Clamping Screw
③ Track Rail Assembly 1 ⑦ Pipe
④ Track Rail Assembly 2 ⑧ Sensor 2
Figure 5-24 Direct Mount Roller Chain
Note
For a vertical pipe installation, use a tie, tape or bungee cord to hold the two tracks in
place while chaining.
6. Finger tighten the chain Tension Screw to secure the chain and tracks to the pipe.
Connecting
5.2 Sensor Wiring
FUP1010 IP67 Portable Flowmeter
56
Operating Instructions, 02/2010, A5E02951522A Revision 01