Maintenance 6
Maintenance after first 50 operating hours
Maintenance after first 50 operating hours
Maintenance during the break-in
period
NOTE
Some of the following tests require special
tools. Contact the service centre.
– Check the propellant system for leaks with
leak spray.
– Check the connections of the propellant
system for secure seating.
– Check status and tension of ribbed V-belt;
see ⇒ Chapter "Checking the ribbed
V-belt", P. 6-226.
– Check exhaust gas system; see ⇒ Chap-
ter "Checking the exhaust gas sys-
tem", P. 6-227.
171673 [EN] 199