Start-Up Programming & Operation
This chapter explains the functions of the LED operator and how to program the drive for initial
operation.
4.1
SECTION SAFETY.................................................................................................56
4.2 USING THE DIGITAL LED OPERATOR................................................................58
4.3 THE DRIVE AND PROGRAMMING MODES.........................................................62
4.4 START-UP FLOWCHART......................................................................................68
4.5 POWERING UP THE DRIVE..................................................................................69
4.6 NO-LOAD OPERATION TEST RUN......................................................................70
4.7 TEST RUN WITH LOAD CONNECTED.................................................................71
4.8 VERIFYING AND BACKING UP PARAMETER SETTINGS.................................72
4.9 TEST RUN CHECKLIST.........................................................................................73
4
YASKAWA ELECTRIC SIEP C710606 31B YASKAWA AC Drive – J1000 Technical Manual
55
http://nicontrols.com