Quick installation and commissioning flowchart
SeeTask
Type designation key (page 54)
Identify the frame of your drive: R1…R9.
Guidelines for planning the electrical install-
ation (page 95)
Plan the installation: select the cables, etc.
Examine the ambient conditions, ratings and
required cooling air flow.
Technical data (page 265)
Mechanical installation (page 59)
Unpack and examine the drive.
Make sure that all necessary optional mod-
ules and equipment are present and correct.
IEC: Grounding system compatibility
check (page 132)
If the drive will be connected to another sys-
tem than symmetrically grounded TN-S sys-
tem: Examine if you must disconnect the EMC
filter or ground-to-phase varistor.
North America: Grounding system compatib-
ility check (page 176)
Mechanical installation (page 59)
Install the drive on a wall.
Routing the cables (page 114)
Route the cables.
IEC: Measuring the insulation (page 130)
Measure the insulation of the input cable and
the motor and the motor cable.
North America: Measuring the insula-
tion (page 174)
IEC: Connecting the power cables (page 139)
Connect the power cables.
North America: Connecting the power
cables (page 184)