Unpacking and examining delivery, frame R5 and R6
The figure below shows the layout of the transport package. Examine that all items
are present and there are no signs of damage. Read the data on the type
designation label of the drive to make sure that the drive is of the correct type.
See section Type designation label (page 52).
1
10
2
3
4
5
6
7
8
9
11
Screw M5×25, 4 pcs8
Straps9
Control panel selected in the order (in
a separate package) in the option box
North America: Control panel factory
installed
10
Possible options in separate packages,
if they have been ordered with a plus
code, such as for example +K490 (FEIP-
21 Two-port EtherNet/IP adapter mod-
ule) in the option box.
North America: Options may be ordered
as factory installed.
11
Note: Hood included with option +B056
(IP55/UL Type 12) in North America
Note: Hardware and firmware manuals can
be ordered as a separate kit, see Manual kit
ordering codes (page 57)
Mounting template1
Fixing brackets, 4 pcs2
In the option box3
Europe: Quick installation and start-
up guide kit (6 languages)
North America: Quick installation and
start-up guide
Multilingual residual voltage warning
stickers
Cable box
Note: The cable box is mounted to the
IP55 drive module frame at the factory.
4
VCI bag for protecting against dust and
humidity
5
Cardboard box6
Pallet7
76 Mechanical installation
4

Table of Contents

Other manuals for ABB ACS580 Series

Related product manuals