EasyManua.ls Logo

ABB ACS580 Series - Page 83

ABB ACS580 Series
468 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
North America: Quick installation and
start-up guide
Multilingual residual voltage warning
stickers
Control panel selected in the order (in
a separate package) in the option tray
North America: Control panel factory
installed
10
Possible options in separate packages,
if they have been ordered with a plus
code, such as for example +K490 (FEIP-
21 Two-port EtherNet/IP adapter mod-
ule) in the option box.
North America: Options may be ordered
as factory installed
11
Mounting template on top of the option
tray
12
Note: Hood included with option +B056
(IP55/UL Type 12) in North America
Note: Hardware and firmware manuals can
be ordered as a separate kit, see Manual kit
ordering codes (page 57)
Cable box. Power and control cable
grounding shelves in a plastic bag, as-
sembly drawing.
Note: The cable box is mounted to the
IP55 drive module frame at the factory.
1
Drive with factory installed options2
Cardboard box3
Straps4
VCI bag for protecting against corro-
sion
5
Pallet6
Stopper7
Option tray8
In the option tray9
Europe: Quick installation and start-
up guide kit (6 languages)
To unpack:
Cut the straps (4).
Remove the cardboard box (3) and option tray (8).
Remove the VCI bag (5).
Attach lifting hooks to the lifting eyes of the drive (see the figure in section
Safety (page 59)).
Lift the drive with a hoist.
Recycle the package material according to local regulations.
Mechanical installation 83

Table of Contents

Other manuals for ABB ACS580 Series

Related product manuals