Focus 61 User Guide Programming Focus 61
63 (118) 9839 0211 01 Edition 2.0
Job Name
Name of the Job.
Job Order
- Fixed: The Steps of the Job are executed in the order specified in the window above.
- Free: The Steps of the Job are executed according to the Optional Trigger defined in the Step
parameter. The Optional Trigger is a barcode string that must be scanned before executing
the step.
See below for further details about the Step parameters.
NOK Strategy
- Abort: If a Step is executed with Not OK result, the Job is aborted.
- Continue: If a Step is executed with Not OK result, the Job continues.
Timeout [s]
Maximum time (in seconds) to complete the Job. If it is equal to zero there is no control on the
time. By default it is set on 120 seconds.
Lock After Job Done
If enabled, the MWR is locked at the end of the Job (the Job must start again to continue).
If disabled, a new Job restarts automatically when the previous Job is complete.
NOTE: The total number of Jobs is equal to 1000. They are distributed as follows: 300 Jobs for
Station 1, 300 Jobs for Station 2 and 400 Jobs for global (shared between Stations).
At the end of the configuration, click Save.
NOTE: Save is unavailable if there are no steps in the Job.
To add a Step, enter the parameters in the Add Step area and click Add Step:
Name
Step name.
Group
Select the group from the list of Group associated with the Station.
Batch Size
Number of bolts which need to be tightened (Batch).
Infinite Batch Size
Selecting Infinitive batch Size option, the Step works an infinite number of times/bolts. This
option disables Batch size setting.