EasyManua.ls Logo

Bacci Twin - Information on Load Handling and Installation

Bacci Twin
202 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 4 – Installation
Chap. 4
- 3/20 -
4.1 Information required on handling of loads and installation
The following paragraphs provide the minimum information required on how to handle loads correctly
and install the machine.
For installation always refer to this manual and the documents mentioned in the different procedures.
This chapter contains all the necessary information on the installation step of the machine.
This step includes the preparation, loading and unloading of the machine for transport purposes.
Furthermore it describes the positioning of the machine components and its fastening to the floor. Finally,
it illustrates how to assemble the components removed in order to facilitate transport and connect the
machine to the electric and pneumatic system.
All operations described in the Installation chapter must be performed by qualified personnel authorized
by PAOLINO BACCI S.r.l.

Table of Contents