6.9 Extraordinary maintenance
The maintenance described here following requires know-who and specific tools.
This maintenance may be carried out only by the Paolino Bacci S.r.l. Technical Servicing department or
by technical personnel authorized by Paolino Bacci S.r.l.
Pneumatic system:
Solenoid valve check (heating and binding) and FRL group check, including replacement as required.
Electrical wiring:
Electrical, electronic and electro-mechanical components
Check on the electrical manifold of the machining head and brush replacement
Electrical cabinet conditioner fan
Overhaul of the electrical cabinet conditioner
Mechanical
Check that transmission belts are taut.
Check that mechanical organs are tight (ring nuts, flanges, etc.).
6.10 Decommissioning
Before long idle periods, the machine must undergo the following maintenance:
Thorough cleaning
Lubrication of all moving parts
Surface rust-proofing treatment on all unpainted metal parts (apply oil or MoS2 spray).
Cover the machine with a water-proof sheet to protect it against dust and humidity.