EasyManua.ls Logo

Bacci Twin - Operating Procedures; Machine Start-Up Procedures

Bacci Twin
202 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 5 – Controls and use
Chap. 5
- 13/48 -
5.2 Operating procedures
The sections that follow describe the operator tasks required for correct machine operation.
We recommend designated personnel read and fully comprehend the instruction manual, particularly as
regarding operating instructions and safety recommendations.
5.3 Machine turn on and start up procedures
First machine start-up must be carried out by our technical assistance personnel or by maintenance
personnel duly trained and qualified to carry out the first start-up procedure.
The first start-up procedure may be carried out first as an empty run, without loading pieces into the
machine, to check the correct functioning of the machine units and, subsequently, loading pieces to be
machined to check that the machine and the piece gripping devices are functioning properly.
Machine production depends on customer choices (with the exception of the limits specified in this
manual); each type of production needs to be prepared based on the characteristics of the final product.
The sections that follow describe the procedures to be carried out to turn on, start-up and run the
machine.

Table of Contents