TWIN – Use and maintenance instruction manual
Chap. 4
- 4/20 -
4.1.1 Loads handling equipment provided by the customer
For handling loads and installing the machine it is necessary to have the equipment listed in the following
tables.
Upon receiving the machinery, unless otherwise agreed, all the material must be available in the
installation site.
LOADS HANDLING EQUIPMENT 1 of 1
EQUIPMENT
Crane
Stacker
Rocker arm
Galvanized screw pin shackles
Hoisting accessories (e.g. chains, belts, lashing
ropes)
INFORMATION!
The choice of the means to use for handling loads must be based on the evaluation of the
mass to hoist and the existence of environmental limitations, such as the height of the
installation site and accesses.