EasyManua.ls Logo

Bacci Twin - 2.16.2 Residual risks during normal operation; 2.16.2.1 Normal operation - (Risk ID: 04.06)

Bacci Twin
202 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TWINUse and maintenance instruction manual
Chap. 2
- 36/52 -
2.16.2 Residual risks during normal operation
2.16.2.1 Normal operation – (Risk ID: 04.06)
IDENTIFICATION RISK ASSESSMENT
Stage: Use
Person: Operator
Area: Z03 Inside the machine
Initial risk: HIGH
RESIDUAL RISK: MEDIUM
PLr (EN 13849): -
SIL (EN IEC 62061): -
ACCIDENT SCENARIO
Consequence:
7.6 Fire
Situation:
Accumulation of dust and machining residues (chips).
Event:
Fire hazard deriving from contact between dust and machining residues with live
flames or parts of the electrical system.
Body part:
Entire body.
RESIDUAL RISK
Fire hazard deriving from contact between dust and machining residues with live flames or parts of the
electrical system.
LIMITATION MEASURES
Mechanical:
Arrange for connection to a centralized dust removal system (SAFETY MEASURE
M13)
Electrical:
-
Informative:
- Connect the machine to a vacuum system with a capacity equal to that specified
in the technical data.
- Periodically remove dust and machining residue from the machine frame, avoiding
accumulation.
- Do not use live flames and periodically check the insulation of all electrical
components near dust accumulations spots.
- The employer is required to include this assessment in the plant risk assessment
procedures procedure in order to implement appropriate ORGANISATIONAL
measures for risk reduction.
Symbols:
-

Table of Contents