CHAPTER 5 – Controls and use
Chap. 5
- 31/48 -
5.6.4 TANDEM processing cycle
The machine must be used by the operator or machine maintenance technician, for the
normal processing procedures of the materials.
STAGE DESCRIPTION
1
Perform machine setup, by following the operations described in section “TANDEM
processing cycle setup”.
2
For performing the processing cycle (CNC program) follow the instructions described in
previous section “5.6.3 - SINGLE STEP loading/unloading (processing cycle)”.
3
At the end of TANDEM processing, the machine setup must be performed, reassembling
the central protection of Y1-Y2 axes and selecting the processing parameters in the
control software.