Programmable Bidirectional DC Power Supply 62000D Series
Operating and Programming Manual
2-14
Figure 2-6
2.6 Power On Procedure
Plug in the power cord and turn on the power switch on front panel. The DC power supply
will run a series of self-tests. The display on the front panel will turn on to run self-tests for
CPLD (complex programmable logic device), SRAM and EEPROM memory, data and
communication as Figure 2-7 shown below.
Figure 2-7