188 678.1 - RHB LEXION 480 2.1.31
Air conditioner
2. Bolt down high-pressure switch (12) to the filter
receiver drier.
(Fig. 84, 86)
3. Fasten filter receiver drier to bracket (4) using a
hose clamp (6).
4. Connect the cable plugs to the low-pressure
switch (1) and the high-pressure switch (12).
5. Fit the discharge line (11) and hose line (10) to the
filter receiver drier with new O-rings.
6. Top up refrigerant oil.
7.
Air conditioning system – Topping up refrigerant
,
see page 2.1.3
(Fig. 84, 87)
86
87