EasyManua.ls Logo

Dräger Julian - Self-test Procedures

Dräger Julian
144 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Preparing Julian for the self-test
● Make sure that the breathing system is securely
connected.
1 Close the Y-piece = plug firmly on to the cone.
2 Ensure that the sample line is connected to the
Y-piece and to the water trap on the back of the
workstation.
Self-test
If all points on the checklist are OK:
● Confirm = press the rotary knob.
The self-test is started.
The self-test is run automatically
and takes 3 to 4 minutes.
Julian carries out the following automatic tests and
actions:
Electronics
– Testing and calibration of gas metering bench
– Testing and calibration of O2 sensor
– Testing of pressure sensor for airway pressure
measurement
– Testing the flow sensor
– Testing the battery
– Activating the default settings for alarm limits,
monitoring parameters and the default settings of
the ventilator and fresh gas settings
Fresh gas mixer
– Testing of gas supply O2, N2O, AIR
– Testing of gas inlet valves
– Calibration of pressures sensors in the compressed
air supply
– Testing of O2 emergency metering
– Testing of fresh gas failure monitoring (optional)
Ventilator and breathing system
– Testing and calibration of PEEP/Pmax valves
– Testing of safety valve
– Testing of MAN/AUTO switch-over valve
– Calibration of flow monitoring valve
– Testing of time monitoring valve
– Testing of bellows
31
Starting Up
Checking the workstation against the checklist
2
2
1
"Only for internal use by Draeger. Not applicable as Instructions for Use!"

Table of Contents