EasyManua.ls Logo

DURKOPP ADLER 650-10 - Performing a Test Run

DURKOPP ADLER 650-10
176 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Setup
Operating Instructions 650-10 - 03.0 - 08/2016132
8.10 Carrying out a test run
Perform a test run when setup is complete.
To perform a test run:
1. Insert the power plug.
2
. Wind on the hook thread ( p. 32).
3. Switch on the machine.
4. Fill the bobbin at medium speed.
5. Switch off the machine.
6. Thread the needle and hook threads ( p. 23) and
( p. 26).
7. Switch on the machine.
8. Position the sewing material.
9. Perform a test run, first at low speed and then at continually
increasing speeds.
10. Check that the seams conform to the desired requirements.
11. If the requirements are not satisfied:
Alter the thread tension ( p. 27) and ( p. 32).
If necessary, also check the settings listed in
the
Service Instructions
and correct them as required.
CAUTION
Risk of injury from sharp parts!
Punctures possible.
Switch off the machine before threading the
n
eedle or hook thread.

Table of Contents

Other manuals for DURKOPP ADLER 650-10

Related product manuals