EasyManua.ls Logo

Epson Stylus Pro 4400 - Screws Securing the Pump Cover; Pump Cover Removal

Epson Stylus Pro 4400
506 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EPSON Stylus Pro 4400/4450/4800/4880/4880C Revision C
Disassembly & Assembly Disassembly Procedures 323
4.2.8.8 Pump Phase Sensor
1. Remove "Pump Unit".
(Refer to "4.2.8.6 Box Assy., Flushing / Pump Unit" (p316).)
2. Remove the two screws securing the "Pump Cover".
(Refer to Figure 4-163.)
C.B.P. 3x8: 2 pcs.
3. Remove the "Pump Cover" in the direction of the arrows.
(Refer to Figure 4-164.)
Figure 4-163. Screws Securing the Pump Cover
Figure 4-164. Pump Cover Removal
Pump Cover
C.B.P. 3x8
1
2

Table of Contents

Other manuals for Epson Stylus Pro 4400

Related product manuals