EasyManua.ls Logo

GE Optima XR646 - Failed QAP

GE Optima XR646
463 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 14: Quality Assurance and Maintenance
5495975-1EN Rev.9 14-11
© 2013-2017 General Electric Company. All rights reserved.
Figure 14-13 QAP Results screen
Failed QAP
Note: In the event of a failed QAP test, repeat the QAP procedure to confirm the failure. This section
identifies common problems to check.
If a single failure is confirmed, call to schedule service. The system is operational, although inspection
and potential calibration are needed.
If multiple failures are confirmed, image quality may be effected; cease use of the unit and call for imme-
diate service.

Table of Contents

Related product manuals