GE Healthcare Senographe DS
Revision 1 Service Information and Procedures Class A 2385072-16-8EN
Job Card D/R A206A - Lift Gas Spring
Page no. 1183 Chapter 9
JC-DR-A-206.fm
Job Card D/R A206A - Lift Gas Spring Chapter 9
1SUPPLIES
Lift Gas Spring
2TOOLS
Standard Tool Box
3 REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 60 minutes
4 SAFETY PRECAUTIONS
WARNING
The lift gas spring has a larger mechanical energy when the arm is at heights of less than
the maximum height. To minimize the risk of rapid gas spring movement due to stored
mechanical energy, you must ensure that the Arm is raised to its maximum height before
you proceed.
WARNING
The Gantry must be powered off.
5 PREREQUISITES
• The arm must be in the vertical position.
• Raise the arm to its maximum height.
• Switch off the Gantry power.
• Remove the Front and Column covers for access (refer to Job Card PHY A044 - Remove/Reinstall
Gantry Covers on page 523).
• Release and remove the Gantry curtains (refer to Job Card D/R A208 - Gantry Curtains on page
1193).