GE Healthcare Senographe DS
Revision 1 Service Information and Procedures Class A 2385072-16-8EN
Job Card D/R A223 - Rotation Optical Fork
Page no. 1231 Chapter 9
JC-DR-A-223.fm
Job Card D/R A223 - Rotation Optical Fork Chapter 9
1SUPPLIES
Rotation Optical Fork
2TOOLS
Standard Tool Box
3 REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 75 minutes
4 SAFETY PRECAUTIONS
WARNING
The Gantry must be powered off.
5 PREREQUISITES
• Switch off the Gantry power.
• Remove the front covers (Refer to Job Card PHY
A044 - Remove/Reinstall Gantry Covers on page
523).
• Loosen and remove the Gantry curtain (refer to Job
Card D/R A208 - Gantry Curtains on page 1193) to
access the Optical Fork (1).
1