GE Healthcare Senographe DS
Revision 1 Service Information and Procedures Class A 2385072-16-8EN
Job Card D/R A266 - Tube Tilt Board
Page no. 1365 Chapter 9
JC-DR-A-266.fm
Job Card D/R A266 - Tube Tilt Board Chapter 9
1SUPPLIES
Tube Tilt Board
2TOOLS
Standard Tool Box
3 REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 2 hours
4 SAFETY PRECAUTIONS
WARNING
The Gantry must be powered off.
5 PREREQUISITES
• Rotate the arm to 0° and move it to its lowest position for
access to the Tilt Board (1).
• Switch off the Gantry power.
• Remove the tube cover (Refer to Job Card PHY A044 -
Remove/Reinstall Gantry Covers on page 523).
1