EasyManua.ls Logo

GE Senographe DS

GE Senographe DS
1810 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE Healthcare Senographe DS
Revision 1 Service Information and Procedures Class A 2385072-16-8EN
Job Card PM A205 - Mechanical checks and lubrication
Page no. 1779 Chapter 11
JC-PM-A-205.fm
Job Card PM A205 - Mechanical checks and lubrication Chapter 11
1SUPPLIES
Lubricant
Grease (for Lift and Rotation)
2TOOLS
Standard Tool Box
3 REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 20 minutes
4 SAFETY PRECAUTIONS
WARNING
Before working on any Gantry mechanism, shut down the equipment and switch OFF the
Senographe hospital supply circuit breaker. Lock it in the OFF position or mark it clearly
with a warning sign to prevent others from applying power.
NEVER switch off at the UPS except in emergency (risk of data loss).
5 PREREQUISITES
The Gantry Column and Compression Arm covers must be removed. Refer to Job Card PHY A044 -
Remove/Reinstall Gantry Covers on page 523.
Release the four hex head screws securing the lower X plate (10 mm open-ended wrench).

Table of Contents

Other manuals for GE Senographe DS

Related product manuals