EasyManua.ls Logo

GE Senographe DS

GE Senographe DS
1810 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE Healthcare Senographe DS
Revision 1 Service Information and Procedures Class A 2385072-16-8EN
Job Card PM A255 - Collimator and Tube Head Cleaning
Page no. 1787 Chapter 11
JC-PM-A-255.fm
Job Card PM A255 - Collimator and Tube Head Cleaning Chapter 11
1SUPPLIES
None
2TOOLS
Small Static Duster
Flat Field Phantom
Cotton buds or similar (e.g. a digital camera sensor cleaner as shown below)
Ethanol
Standard Tool Box including a small Pozi screwdriver
3 REQUIRED EFFORT
Personnel: 1 Field Engineer
Time:45 - 60 minutes
4 SAFETY PRECAUTIONS
WARNING
Before working on any Gantry mechanism, shut down the equipment and switch OFF the
Senographe hospital supply circuit breaker. Lock it in the OFF position or mark it clearly
with a warning sign to prevent others from applying power.
NEVER switch off at the UPS except in emergency (risk of data loss).
5 PREREQUISITES
If necessary, switch off the Gantry power.
Remove the tube covers (refer to Job Card PHY A044 - Remove/Reinstall Gantry Covers on page
523) to access Collimator and Tube Head.

Table of Contents

Other manuals for GE Senographe DS

Related product manuals