EasyManua.ls Logo

GE Senographe DS

GE Senographe DS
1810 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE Healthcare Senographe DS
Revision 1 Service Information and Procedures Class A 2385072-16-8EN
Job Card D/R A251 - Paddle Holder Board
Page no. 1331 Chapter 9
JC-DR-A-251.fm
Job Card D/R A251 - Paddle Holder Board Chapter 9
1SUPPLIES
Determine whether you have a Paddle Holder Board with or without DIP switches. To do this, remove
the Paddle Holder Cover and view the left hand side of the Paddle Holder Block where the earth cable
is connected (see below).
Order the appropriate Paddle Holder Board according to the type already present in the Gantry.
Paddle Holder Board (PN 2369391) if the existing Paddle Holder Board does not have a set of DIP
switches.
Paddle Holder Board (PN2369391-2) if the existing Paddle Holder Board does have a set of DIP
switches.
2TOOLS
Standard Tool Box
3 REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 30 minutes
4 SAFETY PRECAUTIONS
WARNING
The Gantry must be powered off.
Without DIP switches With DIP switches

Table of Contents

Other manuals for GE Senographe DS

Related product manuals