Job Card CHK A001 - Boot/Init and Shutdown
Page no. 1735 Chapter 9
JC-CHK-A-001.fm
12 SYSTEM COMPONENT RESET
It may occasionally be necessary to reset one or more components of the system. This usually involves
switching the component(s) off and on again. The following table shows suggested switch-off points,
classified for use by operating personnel or by FEs (i.e., trained personnel with access to system cabi-
nets).
TABLE 1 - RESET OPERATIONS
CAUTION
It is recommended that the IDC should not be booted or reset by itself without a complete
system shutdown/power on.
If the IDC is rebooted, a minimum interval of two (2) minutes must be left before booting it
again. Booting the IDC twice within two minutes may seriously degrade the detector.
Component(s) Operator F.E. Comments
Whole system Hospital supply ON/OFF
switch
Hospital supply ON/OFF
switch
Conditioner Hospital supply ON/OFF
switch
Conditioner OFF button
inside MDR
Gantry and Generator OFF/ON at X-ray Con-
sole
Generator Circuit breaker
in Generator Cabinet
Also resets the Detector
and its power supply
Detector and its power
supply
OFF/ON at X-ray Con-
sole
Detector OFF button
inside MDR
OFF/ON at X-ray Con-
sole also resets the Gan-
try and Generator
Control Station and all
contents (AWS system,
monitor, IDC, modem,
CD-R/W, light box)
Click on System Off but-
ton in Browser. Wait two
minutes for UPS shut-
down
Control Station OFF but-
ton on side of Generator
cabinet
System Shutdown
includes shutdown of
Gantry and Generator.
UPS Click on System Off but-
ton in Browser. Wait two
minutes for UPS shut-
down
Control Station OFF but-
ton on side of Generator
cabinet
System Shutdown
includes shutdown of
Gantry and Generator.
IDC Click on System Off but-
ton in Browser. Wait two
minutes for UPS shut-
down
IDC reset button at rear
of the IDC.
See Caution below.
System Shutdown
includes shutdown of
Gantry and Generator.
AWS Click on System Off but-
ton in the Tool kit menu.
Reboot
Open a command win-
dow; type halt. Then type
reset.

Table of Contents

Other manuals for GE Senographe DS

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE Senographe DS and is the answer not in the manual?

GE Senographe DS Specifications

General IconGeneral
BrandGE
ModelSenographe DS
CategoryMedical Equipment
LanguageEnglish

Related product manuals