EasyManua.ls Logo

GE Senographe DS - Page 358

GE Senographe DS
1810 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 4 Page no. 358
Chap-Pre-Requirements.fm
GE Healthcare Senographe DS
Revision 1 Service Information and Procedures Class A 2385072-16-8EN
Pre-Installation System Requirements
10-4. Interconnecting Cables Path and Length
The diagram below is provided to help planning cable runs between subsystems.
Codification color on the illustration:
Black = Harness, Shipped with the system
Red = Power AC supply (Line Supply Cable) (GEMS supplies a usable length = 6.5 m (21’-4”) cable)
Blue = Door light and switch (local adaptation)
Green = Insite connection
Purple = X-ray Console Cable
CAUTION
Cables between Generator and Gantry and X-ray Console are fragile:
Protect these cables in a cable housing or ensure that the cable path is safe.
3.8 m 14.9'
10 m 32.8' (*)
4.8 m 15.75'
All cable lengths indicated are usable lengths
* - The X-ray Console cable is integrated within harness 2, and cable tied alongside harness 1. It can
be separated from the harnesses, where its total usable length is 10 m (32.8') (between A and A’).
Gantry
X-ray
Console
External
network hub
Control
Station
Customer supplied AC
mains distribution panel
AC
Supply
Optional
60 m 197"
Generator
Cabinet
Door switch
Door Warning
Lights
Insite
connection
Harness 1 :
Harness 2 :
A
A’

Table of Contents

Other manuals for GE Senographe DS

Related product manuals