Chapter 4 Page no. 358
Chap-Pre-Requirements.fm
GE Healthcare Senographe DS
Revision 1 Service Information and Procedures Class A 2385072-16-8EN
Pre-Installation System Requirements
10-4. Interconnecting Cables Path and Length
The diagram below is provided to help planning cable runs between subsystems.
Codification color on the illustration:
Black = Harness, Shipped with the system
Red = Power AC supply (Line Supply Cable) (GEMS supplies a usable length = 6.5 m (21’-4”) cable)
Blue = Door light and switch (local adaptation)
Green = Insite connection
Purple = X-ray Console Cable
CAUTION
Cables between Generator and Gantry and X-ray Console are fragile:
Protect these cables in a cable housing or ensure that the cable path is safe.
3.8 m 14.9'
10 m 32.8' (*)
4.8 m 15.75'
All cable lengths indicated are usable lengths
* - The X-ray Console cable is integrated within harness 2, and cable tied alongside harness 1. It can
be separated from the harnesses, where its total usable length is 10 m (32.8') (between A and A’).
Gantry
X-ray
Console
External
network hub
Control
Station
Customer supplied AC
mains distribution panel
AC
Supply
Optional
60 m 197"
Generator
Cabinet
Door switch
Door Warning
Lights
Insite
connection
Harness 1 :
Harness 2 :
A
A’