Chapter 5 Page no. 368
SC-PRE-A003.fm
GE Healthcare Senographe DS
Revision 1 Service Information and Procedures Class A 2385072-16-8EN
Scenario PRE A003 - Installation Planning Visit
Electrical requirements
11 Check that room power supply require-
ments will be met.
Chapter 4 Pre-Installation System
Requirements, section 5 Electri-
cal Requirements
Electrician
12 Check the line voltage specification. Chapter 4 Pre-Installation System
Requirements, section 5 Electri-
cal Requirements
Electrician
13 Check the line frequency specification. Chapter 4 Pre-Installation System
Requirements, section 5 Electri-
cal Requirements
Electrician
14 Check the kVA load characteristics. Chapter 4 Pre-Installation System
Requirements, section 5 Electri-
cal Requirements
Electrician
15 Check the line impedance. Chapter 4 Pre-Installation System
Requirements, section 5 Electri-
cal Requirements
Electrician
16 Check the main circuit breaker characteris-
tics.
Chapter 4 Pre-Installation System
Requirements, section 5 Electri-
cal Requirements
Electrician
Door protection switches
17 Specify the requirement for provision and
connection of the door X-ray protection
switches.
Chapter 4 Pre-Installation System
Requirements, section 5 Electri-
cal Requirements
Electrician
Insite connection
18 Specify requirements for Insite broadband
connection
Chapter 4 Pre-Installation System
Requirements, section 11 Insite
Connection
Hospital Net-
work Adminis-
trator
Networking
19 Specify network connections and cable
runs.
Chapter 4 Pre-Installation System
Requirements, section 12 Net-
working Connections
Site planner
20 Allocate IP, Gateway, and Subnet mask
addresses.
Chapter 4 Pre-Installation System
Requirements, section 12 Net-
working Connections
Hospital Net-
work Adminis-
trator
Lighting
21 Specify requirements for dimmer switches,
drapes, etc.
Chapter 4 Pre-Installation System
Requirements, section 7 Room
Lighting
Lighting spe-
cialist
# Action Reference Who? Done?