EasyManua.ls Logo

GE Senographe DS - Page 453

GE Senographe DS
1810 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE Healthcare Senographe DS
Revision 1 Service Information and Procedures Class A 2385072-16-8EN
Job Card PHY A012 - X-ray Console Cable Routing
Page no. 453 Chapter 6
JC-PHY-A-012.fm
4. Connect the end of the X-ray Console cable (4) to the side of the X-ray Console (5). Put the X-ray
Console in place above the keyboard.
5. Route the excess X-ray Console cable that is between the Control Station and Generator Cabinet
beside the cable conduit from the Gantry. When routing the X-Ray Console cable between the Con-
trol Station and Generator, ensure that:
it is not kinked and is free from all forms of mechanical stress
it is mechanically protected from damage that could come from unsafe routing in the room, and
other objects in the room
4
5

Table of Contents

Other manuals for GE Senographe DS

Related product manuals