Chapter 9 Page no. 822
SC-PDR-A-001.fm
GE Healthcare Senographe DS
Revision 1 Service Information and Procedures Class A 2385072-16-8EN
Scenario PDR A001 - Post-D/R Procedures
2 POST-D/R PROCEDURES
2-1 Control Station
2-1-1 LCD-AWS Monitor
• If
Stereo or 2D Biopsy Optical Localizer option exists, calibrate the LCD Monitor Monitor
2-1-2 Software Backup Kit-IDC
• After installing or restoring IDC software, IDC parameters must be restored as described in Job Card
ELE A052 - Back-up/Restore Procedure on page 771. If the restore is successful, it is possible to use
the system normally without further intervention.
• If the restore is not possible or is not successful, the following calibrations and checks must be per-
formed:
Calibrations - Checks Job Card
Calibrate backlight Job Card ELE A043 - AWS Monitor Calibration on page 729
Calibrations - Checks Job Card
Bad Pixel Calibration Job Card CAL A041 - Bad Pixel Calibration on page 1693
Gain calibration Job Card CAL A043 - Detector Gain Calibration on page 1697
flat field tests Job Card ELE A032 – IQ Tools Flat Field Test on page 699
If IQ tests not OK, repeat all calibrations from Bad Pixel
Half Value Layer Job Card CAL A046 - Half-Value Layer Measurement on page 1703
Conversion Factor Job Card CAL A045 - Conversion Factor Measurement on page 1701
Use the same dosimeter as that used for CAL A046
AOP Calibration Job Card CAL A051 - AOP Calibration on page 1723
mAs non linearity Job Card CAL A053 - mAs Non-linearity Calibration on page 1725
AOP/SNR Check Job Card ELE A038 - AOP Mode and SNR Check on page 707
If AOP/SNR check not OK, repeat all calibrations from AOP Calibration